Project
AMC Prime Theaters

- Location
- Multiple locations
- Completed
- September 2025
- Architect
- Focal Design Studio
- Manufacturer
- Wall Panel Systems
Focal Design Studio's PRIME at AMC lobby portal is clad in Fundermax phenolic panels carried on the Wall Panel Systems attachment system, which turns the outside corners and returns into the opening without exposed fasteners. The first house completed in September 2025 and the rollout continues across the circuit.
More from this project



Considering a similar assembly?
We can provide samples, detailing support, and a preliminary budget for the same lines on your project.